Retail Market Improvements

ICF_054

Substitution A process undertaken for the replacement of missing (null) or erroneous accumulated metering data or interval metering data where metering data has failed Validation. type approvals associated with small market Energy Rules TermsInterval Period over which interval energy data is recorded by the metering installation that corresponds to a TI or submultiples of a TI. Metering have risen dramatically from affected FRMPs, ENLRs and LNSPs. This project aims to reduce exceptions and administration for small market Interval Metering stakeholders when handling Metering Data.

These approvals are required when the MDP Meter Data Provider. An organisation which installs, commissions, gathers, and verifies data remotely from meters in the National Electricity Market (NEM). intends to apply the Type 16 Agreed Method The allowed operation for a resource, e.g. GET, POST, PUT, DELETE, and so on. These operations determine whether you’re reading information, creating new information, updating existing information, or deleting information.. When applied, the underlying cause of the Substitution is not transparent to recipients as it is difficult to distinguish between an applied substitution provided due to crossed meters or failed phase on 3 phase supply.

The affected stakeholders include:

  • MDPs sending Substitution Types and Reason Codes in Transactions.
  • AEMO Australian Energy Market Operator, FRMPs, ENLRs, and LNSPs receiving the Substitution Types and Reason Codes in Transactions.

ICF_072

AEMO’s Meter Data Management (MDM Meter Data Management system includes the Profile Preparation Service, Basic Meter Profiling, and Data Aggregation.) system generates the following load profiles, to support market settlement processes:

In recent years, NSLP trading interval Energy Rules Terms values have substantially reduced. When positive and negative NSLP trading interval values are present, significant fluctuations, or spikes, are observed when the NSLP is applied to accumulation metering data. These spikes are a consequence of having a small denominator value in the profiling algorithm.

The profiled energy would correctly sum to the original metering data. However, the profiled values may not be representative.

AEMO is working on a selection of NSLP Floor Values to eliminate spikes in the Profiling Algorithm.

The affected stakeholders include:

  • FRMPs and ENLRs

High-level changes

Function

Enhancement

Description

Reference

Impacted

MSATS functionality

Accumulation Meter Reads

ICF_072

Reads into 5-minute Trading Intervals

Net System Load Profile Methodology (NSLP)

ENLR

FRMP

B2M – CATS

Meter Type Accumulation – – Net System Load Profile

ICF_072

NSLP Floor value

Net System Load Profile Methodology (NSLP)

ENLR

FRMP

B2M – CATS

MTRD Transactions

ICF_054

New Substitution Types

Removed Substitution Types

New Reason Codes

MTRD Transactions B2B and B2M

ENLR

FRMP

LNSP

MDP

MDM

MDFF NEM12 & NEM13 v2.6

ICF_054

New Reason Codes

New MSATS reason codes

MDP

B2B

New validation rules

ICF_054

None

 

Validation Rules

ENLR

FRMP

LNSP

LRs

MDP

B2B

B2M

NSLP Trading Intervals

ICF_072

NSLP Floor value

Net System Load Profile Methodology (NSLP)

ENLR

FRMP

B2M – CATS

Profile Area

ICF_072

Non-zero NSLP Floor value

Net System Load Profile Methodology (NSLP)

ENLR

FRMP

B2M – CATS

Reason codes

ICF_054

10 new Reason Codes

Reason Codes

ENLR

FRMP

LNSP

MDP

B2M

Substitution types

ICF_054

New Substitution Types

Removed Substitution Types

Substitution Types

ENLR

FRMP

LNSP

MDP

B2B

B2M

C1 report

ICF_072

NSLP_FLOOR_VALUE query to support the NSLP methodology

C1 Report

FRMP

B2M – CATS

RM29 report

ICF_054

RM29 report includes a new SDQ query

RM29 Participant Standing Data Report

MDP

B2B

B2M