1 Introduction

1.1 Audience

AEMO Australian Energy Market Operator provides this information as a service targeting business analysts and IT staff in Registered Participant See Relevant Rules or Procedures companies.

The primary audiences are:

1.2 Objective

The IDX Industry Data Exchange – Basic Power Quality Data - July 2026 (Release) describes the projects planned by AEMO from a participant perspective and includes any system related changes for participants.

1.3 Status

Initial draft for review. The design is not ready for participants’ builds

Presents the IDX – Basic Power Quality Data - July 2026 evolving design.

Please send feedback to Contact Us. In the Details of your enquiry section, mention the EAS Knowledge Management team as the Resolver group.

Version

Status

1.04

The Power Quality Data API is available in pre-production. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details

1.03

The Power Quality Data API design is now available for participants’ builds. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details

1.02

The Power Quality Data API design is now available for participants’ builds. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details

1.01

The Power Quality Data API design is now available for participants’ builds. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details

1.00

The Power Quality Data API design is now available for participants’ builds. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details including authentication mechanisms and responses

0.06

The Power Quality Data API design is now available for participants’ builds. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details including authentication mechanisms and responses

0.05

The Power Quality Data API design is now available for participants’ builds. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details including authentication mechanisms and responses

0.04

The Power Quality Data API design is now available for participants’ builds. AEMO anticipates design updates to the Markets Portal interfaces, access information, and API specification details including authentication mechanisms and responses

0.03

In progress. The design is not ready for participants’ builds

0.02

In progress. The design is not ready for participants’ builds

0.01

Initial draft for review. The design is not ready for participants’ builds

Presents the IDX – Basic Power Quality Data - July 2026 evolving design.

Please send feedback to Contact Us. In the Details of your enquiry section, mention the EAS Knowledge Management team as the Resolver group.

 

1.4 Release dates

Scheduled for implementation in:

1.5 Projects and enhancements

Changes and enhancements for this Release include:

No.

Functionality

Change

Affected interface

Reference

 

1

IDX Web Applications

New interfaces for managing Basic Power Quality Data (BPQD) and participant controls

Markets Portal

Markets Portal

 

2

PQD

API for BPQD submission and retrieval

API

Power Quality Data API

 

3

WebSockets

WebSockets for event notification and flow control events

IDX

Industry Data Exchange Platform Standard

 

 

1.6 Rule and procedure changes

 

Title

Version

Effective date

National Electricity Amendment (Accelerating smart meter deployment) Rule 2024 No. 20

2025/01

Final

Guide to the role of Metering Coordinator

1.41

1 July 2026

Basic Power Quality Data Procedure

1

1 July 2026

Retail Electricity Market Procedures- Glossary and Framework

4.4

1 December 2025

Metrology Procedure: Part A

7.9

1 July 2026

Metrology Procedure: Part B

7.9

1 July 2026

B2B Procedure: Data Posting Process

4.0

1 July 2026

B2B Procedure: Customer and Site Details Notification Process

4.0

1 July 2026

B2B Procedure: Service Order Process

4.0

1 July 2026

B2B Procedure: Meter Data Process

4.0

1 July 2026

B2B Procedure: One Way Notification Process

4.0

1 July 2026

B2B Procedure: Technical Delivery Specification Process

4.0

1 July 2026

1.7 Related technical specifications

Title

Description

IDX – Industry Data Exchange Platform – July 2026

Industry Data Exchange Platform core functionality

IDX - AEMO Gateway Software - June 2026

AEMO Gateway software release

1.8 Related documents

These guides and resources are updated according to this technical specification and published for the pre-production Release Date.

Title

Description

Status

Industry Data Exchange Platform Standard

Describes the technical standards, protocols, and payloads for data exchange on the Industry Data Exchange (IDX) platform

Draft

Markets Portal Help

Information about the PQD API, IDX APIs, and IDX web interfaces and managing  Basic Power Quality Data (BPQD)

In progress

API Portal

AEMO API information

In progress

1.9 Approval to change

No approval or agreement to change required from participant change controllers.

1.10 Market systems user group meetings

The Market Systems User Group (MSUG Market Systems User Group) is an industry user group established to discuss NEM wholesale and retail IT systems releases. Its purpose is to facilitate the continuing improvement of AEMO's IT systems by seeking feedback and collaboration from participants.

MSUG meetings are open to all interested parties, with invitations sent to all included on the distribution list. If you have a technical question for a project and want to attend the MSUG ask your company’s support team to include your email address in their AEMO Help Desk Bulletin (CRM) distribution list.

1.11 Version numbers

Incremental version numbers such as 1.01, 2.01 and so on mean there is a minor change to the technical specification.

Major version numbers such as 1.00, 2.00 means there are substantial changes to the technical specification. Participants must carefully review these changes, detailed Page 1.

1.12 Changes in this version

This version has the following changes:

  • Revises the pre-production base URL in the PQD API specification.

  • Revises the pre-production release date.

  • Adds BPQD flow control thresholds.